Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Spare Parts for Motor Starter Requirement
Reference: 9712007 3/21/2012, Location: Middle East
Category: Starter

Scope of Work
Supply of spare Parts for Motor Starter Requirement as follows:
Item 001, Fuse switch (Vesco)
Description:
Complete Vesco fuse switch disconnections with fuse links and hand operated gear having Auxiliary contacts (6A) each contact block contains 2NO and 2NC contact max. Amplitude for fuses to be installed on Vesco switches 125A up to 630A.

Item 002, Lamps
Description:
a- Incandescent Lamp 42V, 50 Hz , 60W , E27…Qty 500
c- Signal Lamp 220V, 50 Hz ,2W, E12 ,Edison screw, neon type .. Qty 1000
d- Signal Lamp 18vdc, 2W, E12, 0.11A, use with 120 ohms Edison Screw type...Qty 1000

Item 003, Contactors
Description:
Magnetic contactors type AC3 for induction motors with auxiliary contacts (2NO&2NC), Coil for all contactors is (220 V AC/ 50Hz).

Item 004, Thermal over load relay

Item 005, Thermal over load relay Via C.T.

Item 006, Auxiliary relay (220 V, 50 Hz) Type SR- 40, 3A1B, Ith 16A Qty 250

Item 007, Auxiliary relay (220 V, 50 Hz) Type SR- 40, 2A2B, Ith 16A Qty 250

Item 008, Complete local motor control switch (EXD) enclosure proper to use in zone 1&2



Related Prooducts: Starter Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Environment Agency Grants Permit for Loxley Portland Gas Appraisal Project
UKOG Announces Unaudited Results for Six-month Period Ended 31 March 2020
Broadford Bridge Kimmeridge Oil Discovery Granted 24M Planning Extension
Oil & Gas Industry Welcomes Job Support
Oil Treating & Refining

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us