|
|
|
Supply of Cooling Tower
Reference: 15/2012/E/NR 3/26/2012, Location: Middle East
Category: Cooling Towers
Scope of Work
Supply of cooling tower for asphalt unit / THI-QAR refinery Asphalt unit THI-QAR Refinery request package two cells cooling tower of specification as below: Circulation water capacity 500m³/hr Relative humidity 30%-60% Difference between inlet & outlet temp. 13C° Wet bulb temp. 28C° Drift Losses 0.1% of circulation capacity Evaporation Losses 1.9% of circulation capacity No. of cells 2, capacity of each Is 250 m³ /hr Ambient temp. 55C°(Max.) & -6.5C°(Min.)
The structure should be c/s coated with resistant material of chemicals or galvanized steel. All pipes and interconnections should be c/s All hydraulic connections, considering the battery limit water inlet and outlet flanges Civil engineering, mechanical engineering and electrical engineering included Three main pumps, two in operation & the third stand by, the capacity of each is 250 m³/hr, Head 70m. Two pumps for make up, one in duty & the other is stand by. Skid for chemical dosing pumps supplied with dosing tanks sufficient for 24 working hours, two pumps for each material, one in duty & the other is stand by.
|
Related Prooducts: Cooling Towers
Adsorption Equipment & Materials
Aerators
Agitators & Mixers
Air Conditioning & Refrigeration
Bailers, Sand
Blowers
Boilers
Clarifiers
Condensers
Cooling Towers
Dryers, Drying Machinery & Equipment
Emulsifiers
Furnaces
General
Heat exchangers
Mixers, Static
Nozzles/Diffusers
Steam Generators
Ventilators
Related Tenders:
Agitators & Mixers
Air Conditioning & Refrigeration
Bailers, Sand
Blowers
Boilers
Cooling Towers
Dryers, Drying Machinery & Equipment
Emulsifiers
Furnaces
General
Heat exchangers
Steam Generators
|
|
|
|