Supply of Steam Traps Survey
Reference: LTC/Q34/1882/12 4/1/2012, Location: Middle East
Category: Steam Traps
Scope of Work
Contractor shall collect technical data for installed steam traps in all QG3&4 asset plant using TLV Trap Man Model TM5-EX analyser; Verify/correct the data by visiting the plant and visually inspect each trap. Prepare database, compatible with MS Access/Excel and provide suitable solution for non-functional or mis-functional traps.
|