Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

10K/2000HP Shallow Draft Offshore Jack-Up Drilling & Workover Rigs
Reference: NG01013257 6/4/2012, Location: Africa
Category: Workover Rigs/Services

Scope of Work
The scope of work comprises the provision of two (2) 10K / 2000 HP shallow draft offshore jack up drilling and workover rigs, support services for drilling & completion operations and well testing. The minimum technical requirements and specifications for the rig shall be as follows:
- Rig hull dimension of Length = 220(+/-5)ft and Width = 200 (+/-5)ft, Leg 250ft
- Depth rating of 20,000 ft with 5-1/2” Drill Pipe.
- Drawworks capacity (Maximum input Power) of 2000 HP (1500 KW)
- Three mud pumps of 1600 hp each
- Hookload capacity of 1,300,000 Ibs
- Accommodation for 120 persons minimum
- Transit draft of 9ft
- Min/max operating water depth of 10ft / 150ft
- A Top Drive System (TDS) with the following ratings capacity, 500T, 5000psi WP, Minimum Continuous output torque of 40,000 ft-lbs and preferably AC driven
- Well control equipment rated to 10,000psi working pressure
- Cantilever capability (Reach of 0-57ft and Transverse of 12x12ft)
- Rotary soft torque system
- Auto Catwalk
- Rotary mouse hole
- WITS data from rig instrumentation
- Sewage treatment system (Red Fox- Capacity 150 persons)



Related Prooducts: Workover Rigs/Services Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Tenders: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Vintage Energy to Commence Six Stage Fracture Stimulation at Vali-1 ST1
Vintage Energy Completes First Stage of Vali-1 ST1 Fracture Stimulation
Highly Successful Vali-1 ST1 Flow Test Program Completed
Vali Gas Field Development Concept Completed
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us