Modifications to Various Pipelines
Reference: GT13103200 3/19/2013, Location: Middle East
Category: Oil and Gas Pipeline
Scope of Work
Various pipelines and flowlines were found not resting properly on the supports or pipe supports were dislodged, anchor bolts broken, etc. Therefore, modifications to pipelines and their supports shall be carried out. These pipelines are as follow: 1- DK-413A 4" Flow Line 2- DK-434 4" Flow Line 3- 18" NB Fahahil to Gas Recycling Plant(Arab D)Production Header 4- 12"NB NF to Gas Recycling Plant (Arab D) Crossover injection line 5- RG Plant 6" NGL pipeline to FSP 6- flow line from Khuff Gas Wellhead DKG - 25 to Khuff Plant H
|