Replacement and Construction of Disposal Line Reference: MTC03/2013 4/10/2013, Location: Africa Category: Waste Disposal
Scope of Work
The company desires to release a project of replace a disposal lines at GOSP-7 & GOSP-4 at Nafoora Oil Field.
BRIEF PROJECT DESCRIPTION: a)Replacement and Construction of 6” Disposal line at GOSP-7 at Nafoora Oil Field for tank D-7 and to cancel the existing disposal line for tank D-7 to the separators a new disposal line for tank D-7 should be constructed as separate disposal line. The old above ground pipes should be removed.
b)Replacement and construct new disposal line at GOSP-4 at Nafoora Oil Field. The new disposal line should be 12” diameter form original position of 30” main Header to main pit. The old above ground pipes should be removed