Replacement of Logic Control System
Reference: NO 07/2013 6/10/2013, Location: Africa
Category: Control Panels

Scope of Work
Replacement of logic control system (HEMA)

- of the DCS system, Power Plant II: Including construction of operation station, new engineering station, removal of existing old cabin, laying of suspended cables between instrumentation on site and new DCS system, installation of electronic devices, and all works related to power supply system.



Related Prooducts: Control Panels Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Eni Expands Gas Potential in the Ken Bau Discovery in Block 11
Eni Announces New Discovery in North El Hammad Concession in Egypt
Eni Announces New Oill Production in South West Meleiha Concession
Francesco Gattei Becomes New CFO at Eni

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us