Replacement of Corroded Pipes and Valves
Reference: MTC 08\2013 6/24/2013, Location: Africa
Category: Pipes
Scope of Work
The company desires of release a project Replacement of corroded pipes and valves for fire water system in different locations inside and outside the main station of the field.
The required replacement the followings: - The existing firewater main at facilities area. - The all underground piping. - Interconnecting pipe spools. - Valves. - Firewater main to the army camp
|