Pipeline Maintenance under Road Crossing
Reference: GT13108700 7/24/2013, Location: Middle East
Category: Maintenance and Repair

Scope of Work
Contractor shall carry out the following work on Call-Off basis:
(a)Construction of temporary access roads during Road Crossing replacements.

(b)Excavation of designated 2", 3", 4", 6", 8", 10"and 12" road crossing pipe lines and preparation for inspection.

(c)Re-coating of the excavated pipeline after inspection.

(d)Replacement of corroded 2", 3", 4", 6", 8", 10"and 12" road crossing pipe lines as per QP recommendations.

(e)Installation and Maintaining of Sacrificial Cathodic Protection.

(f)Reinstatement of roads after completion of road crossing.



Related Prooducts: Maintenance and Repair Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Tenders: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

ESA and DMEC Join Forces to Accelerate Marine Energy Solutions through Space
REDAVIA Deploys First Solar Farm in Kenya at Menengai Farmers Ltd
Political, Economic Stability Attracted Investments to Egypt
Egypt's Arrears to Foreign Oil Companies Fall to $850M at End of June
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us