Installation of Trunk Lines, Flow Lines, and Manifolds
Reference: MTC 30\2013 9/8/2013, Location: Africa
Category: Manifold

Scope of Work
Brief Scope of Work:
1.Installation of ten (10) flow lines for tie in of wells in Alkabir field to manifolds in new Alkabir field satellite and installation of one (1) trunk line about 25 km long from the Alkabir field satellite to new GOSP at Q- field.
2.Installation of two (2) 6 – slots manifold at the new satellite of Alkabir field along with a fenced boundary is also a part of this job.
3.Installation of three (3) flow lines and tie-in to the new manifold in UU satellite Conc-65 and installation of one (1) trunk line, about 36 Kms long, from UU field and tie-in to the production header of the manifold at VV field satellite.
4.Installation of one (1) 6 – slots manifold and a multiphase metering arrangement for the well testing purposes at the new UU field satellite along with a fenced boundary are also a part of this job.

Contactor shall supply/install all required equipment, materials….etc to carry out the contractor’s obligation as outlined in Bid documents such as General condition / special condition, specification…etc.



Related Prooducts: Manifold Flanges  Forged Steel  Gaskets  General  High Pressure Connection  Iron Fittings  Lined Fittings  Manhole covers/ grates  Manifold  Plastic Fittings  Stainless Steel Fittings  Steel Fittings  Welding Fitting 

Related Tenders: Flanges  Gaskets  General  High Pressure Connection  Lined Fittings  Manifold  Stainless Steel Fittings  Steel Fittings  Welding Fitting 

Petrobras on Arbitration Involving Sete Brasil
Petrobras on New Gasoline
Petrobras Releases Teaser of E&P Assets in Colombia
Petrobras Ends Its Second Quarter with Positive Ebitda & Free Cash Flow
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us