Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

EPIC for Submersible Pumps
Reference: LT13108600 10/7/2013, Location: Middle East
Category: Submersible Pumps

Scope of Work
The Scope of Work includes provision of Two submersible pumps with their accessories and heavy duty hoses on EPIC basis, to be installed inside STP Toxic Sewage Tank to pump the access sewage that arrive to STP.


Related Prooducts: Submersible Pumps Axial Flow Pump  Deep Well Pumps  Fire Certified Pump, Portable & Wheeled  Fire Certified Pump, Skid mounted  General  High Pressure Pumps  Horizontal Centrifugal End Suction Pumps  Horizontal Split Case Pumps  Hydraulic Pumps  In-Line Pumps  Magnetic Coupled  Mixed Flow Pump  Mud Pumps  Multistage Horizontal Centrifugal  Plastic Pumps  Self Priming Pumps  Slurry Pumps  Submersible Pumps  Vacuum Pumps  Vertical Centrifugal Pump  Vertical Pumps w/ Cardan Shaft  Vertical Split Case Pumps  Vertical Submerged Pumps 

Related Tenders: Fire Certified Pump, Portable & Wheeled  Fire Certified Pump, Skid mounted  General  High Pressure Pumps  Horizontal Centrifugal End Suction Pumps  Horizontal Split Case Pumps  Hydraulic Pumps  Mud Pumps  Self Priming Pumps  Submersible Pumps  Vacuum Pumps  Vertical Centrifugal Pump  Vertical Submerged Pumps 

Completion of the Merger between Quintana Energy & KLX Energy
Great Lakes Signs Subcontract with Bechtel for Sabine Pass LNG
Dynagas LNG Partners LP Declares Cash Distribution on Its Series B Preferred Units
Riviera Resources Announces Sale of North Louisiana Properties for $26.5 Million
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us