Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Installation of Electrical Distribution System
Reference: BID902692 12/8/2013, Location: Africa
Category: Cables

Scope of Work
Installation of Substation –XX Electrical Distribution System:
The scope of this work is to replace and renew 13.8kv and 5kv switchgear panels with transferring all old power cables, remote control cables from Substation x to the new Substation xx ,and that according to approved international standards codes and safety rules regulations without any power failures.



Related Prooducts: Cables Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Matador Resources Announces Realized Hedging Gains for the Second Quarter of 2020
Matador Completes Expansion of San Mateo’s Black River Processing Plant
Matador Announces Initial Boros Well Results
Matador Reports 3rd Quarter 2020 Financial & Operating Results

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us