Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Maintenance Of Heaters
Reference: BID902695 12/12/2013, Location: Africa
Category: Heat exchangers

Scope of Work
ARC intends to carry out the replacement of Radiant casing and Convection roof plates complete with anchors and refractory lining, fuel gas collector at convection section where damaged, radiant casing plates & convection roof plates are present and in bad condition and painting for heaters 10H1, 20H1, 21H3, 21H4, 21H5 & 21H6 including but not limited to dismantling, cleaning, inspection, welding, refractory renewal, coil and tube installation, and start up.

Scope of Works:

1.All the preparatory and prefabrication works required to facilitate the execution of works within the limited duration of turnaround shall be completed well ahead of the commencement of turnaround.

2.All Works shall be carried out in accordance with coils replacement procedure, welding procedure specifications (WPS) and hydrostatic test procedure, which shall be submitted by the Contractor for Owners and third party approval prior to commencement of the Works.

3.Carry out replacement of Radiant casing and Convection roof plates complete with anchors and refractory lining, fuel gas collectors at convection sections where damaged, radiant casing plates and convection roof plates are present and in bad condition and painting for heaters 10H1, 20H1, 21H3, 21H4, 21H5 & 21H6.

4.Carry out all associated works pertaining to heaters maintenance activities mentioned above including but not limited to dismantling, cleaning, inspection, welding, refractory renewal, coil and tube installation, and startup.

5.The Inspection Works shall include all physical examination and NDT according to approved inspection procedures based on codes & standards requirements issuance of a relevant testing report or records for approval by the Owner and third party inspection.

6.All maintenance Works shall be carried out in accordance with and comply with relevant latest edition of ASTM, ASMEAPI 560 standards and codes.

7.After the completion of all the works, the Contractor shall clear the site and transport the surplus material to warehouse or any other location within Refinery premises. The scrap material shall be transported to the scrap yard located within the Refinery premises.

8.The Contractor shall carry out all maintenance works for any damage to the equipment/ component that may occur during the execution of the work at his own expenses




Related Prooducts: Heat exchangers Adsorption Equipment & Materials  Aerators  Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Clarifiers  Condensers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Mixers, Static  Nozzles/Diffusers  Steam Generators  Ventilators 

Related Tenders: Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Steam Generators 

Gasum Group Q2 2020 – Further Growth in Use of Gas Maritime Transport
Athabasca Oil Corporation Announces Q2 2020 Results
Concho Resources Reports Second-Quarter 2020 Results
Baytex Announces 2nd Quarter 2020 Financial & Operating Results

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us