Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Cooling Towers Electrical Substation
Reference: E/32/2013 12/19/2013, Location: Middle East
Category: Cooling Towers

Scope of Work
Supply of cooling towers electrical substation with specifications as follows:

a. Supply and install complete MV 3.3KV switchgear cubicles.

b. Supply and install LV 0.4KV Motor Control Center (MCC).

c. Supply and install power automation system.

d. Supply and install power factor correction unit.

e. Supply and install DC rectifier.

f. Supply and install power transformers.

g. Supply and install Auxiliary Switch Board (ASB).

h. Supply and install air-condition system.

i. Design, supply and build complete substation.



Related Prooducts: Cooling Towers Adsorption Equipment & Materials  Aerators  Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Clarifiers  Condensers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Mixers, Static  Nozzles/Diffusers  Steam Generators  Ventilators 

Related Tenders: Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Steam Generators 

Concho Resources Reports Second-Quarter 2020 Results
SMD Secures New LARS Contract with Orange Marine
Gas Agreement Discussion Commenced for the Pasca A Development
Equinor Receives Consent to use Maersk Intrepid on Martin Linge Field

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us