Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

EPIC for Upgrade of Turbine Control Systems
Reference: GT14100700 1/14/2014, Location: Middle East
Category: Turbines (General)

Scope of Work
EPIC fOR upgrade of turbine control systems aT PS-2, PS-3 AND HALUL; The existing Mark-2 turbine control panels on Siemens power generators at PS-2, PS-3 and Halul are declared obsolete by year 2013 as per OEM (Siemens).

The objective is to upgrade these panels to Siemens SIMATIC S7-400F/FH based control panels. In addition to the relocation of ECU's and the associated Junction boxes on seven ( 7) DLE power generators (i.e. Tempests and Typhoon) to be outside turbine enclosure. Also upgrade to Bently Nevaa 3500 series. Tentative Start date: 01/10/2014 Duration: 30 months.



Related Prooducts: Turbines (General) Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Hydro  Turbines: Steam 

Related Tenders: Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Steam 

Resumption of Production at the Skikda Natural Gas Liquefaction Complex
SONATRACH & the Spanish Group CEPSA Sign a Memorandum of Understanding
Sonatrach Signs Several Contracts with Algerian Companies
Sonatrach CEO Makes Oil Leak Inspection Visit to El Baaj
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us