Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Electrification of Oil Wells
Reference: BID902733 1/17/2014, Location: Africa
Category: Drilling & Well Services

Scope of Work
The Main Tender Committee of Arabian Gulf Oil company desires of release projects as below.

All specialized companies, which have the true desire to participate in any of these tenders, and have the efficiency, ability, previous experience and specialized in Electrification of three wells (hh-104, hh105, dd-45).

It is necessary to provide each tender separately according to the following terms:
1. The representative shall be authorized to draw the tender booklet upon an official document, issued by the body he represents.

2. Who desires to bid has to present the applicant’s qualification and previous experience, supported with documents of the related field, including copies of the handing –over minutes of projects executed for the interested bodies.

3. A copy of work license.(Valid)

4. A copy of a recent Commercial Record Extract .(Valid)

5. A copy of record certificate of the Chamber of Commerce .(Valid)

6. A proof of tax payment . (Valid)

7. A copy of the decree of formation.

8. A copy of the basic structure.

9. A copy of a partnership agreement (if any)- if the company had incorporated or joined another legal person - certified by the local competent authorities or by those at the state headquarters-If the other party in the partnership agreement is a foreigner and approved by the Libyan embassy at the State Headquarters.
10. A work permission from the competent ministry for the foreign companies.
11. The participant is accepted in bid and shall facilitate the field visit procedures to his company's headquarter for the Arabian Gulf Oil company representatives who authorized to examine all his available material and human capabilities .

The Tender should be submitted in three separated envelopes, closed with red sealing wax and with the stamp of the bidder, writing clearly the name of the project, the bid number and the name of the participating Body on each envelope. The first envelope should include a priced financial proposal (original + 2 copies), the second envelope includes a technical proposal (original + 2 copies). As well as the validity of the proposal shall be three months at least from the date of the closing date stated in this announcement.
However, the third envelope should contain an un-priced financial proposal without price, do not mention the price, otherwise, it will be rejected and has to contain the required financial conditions and the required method of payment, with the necessity to agree on all AGOCO general terms and condition.
In order to participate in the tender. However, it has to be submitted in (an original + 2 copies) attached with a preliminarily guarantee.
The Contractor shall be at this own expense obtain and maintain for the Company a bid bond an amount equal(0.5%) of the submitted proposal value Such Bond shall be established as an irrevocable ,unconditional and confirmed letter of guarantee or stand-by letter of credit through a first class Libyan bank or through a first class European bank confirmed and advised to the company through Libyan Foreign Bank(LFB)-Tripoli, or through British Arab Commercial Bank (BACB)-London and delivers with offers and must be the text of this guarantee acceptable to the Company and is rewind to those who do not anchor the tender

The tender participant is obliged to provide good performance guarantee in the case of mooring tender valid for one year from the issuance of the final certificate of completion.



Related Prooducts: Drilling & Well Services Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Tenders: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

San Leon Energy Provides Directorate Change
San Leon Provides Funding for Development of Oza Field
San Leon Announces Interim Results
Update on Investment in Oza Field, Nigeria
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us