Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

EPC Contract of Oil Pipeline
Reference: SU/QT/557N/14 9/15/2014, Location: Africa
Category: Oil and Gas Pipeline

Scope of Work
The Company invites sealed tenders from eligible candidates for The
Engineering Design, Procurement and Construction (EPC), Testing and
Commissioning of a 10” (ten inch) 122km oil pipeline from Sinendet PS 26 to
Kisumu PS28 together with tie in facilities at PS28 for the future Kisumu – Busia Pipeline.

The selected EPC contractor shall among other key activities:

a) Carry out the design, procurement of materials and construction of the 10” pipeline from PS26 (Sinendent) to PS28 (Kisumu)

b) Carrying out Environmental and Social Impact Assessment and obtain Nema approvals

c) Supply, installation and commissioning of a SingleMode 96 strand fibre optic cable along the entire pipeline length, from Sinendet (PS26) to Kisumu (PS28)



Related Prooducts: Oil and Gas Pipeline General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Tenders: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Tank Truck  Tankers 

CGX Energy Provides Operational Update & Appoints Operations Vice President
CGX Energy Announces Appointment of Drilling Director
CGX Provides Update on the Kawa-1 & Makarapan-1 Wells
CGX Energy Completes Grant of Previously Announced Stock Options
Oil and Gas Pipeline

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us