Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply & Installation of Electrical Switchgear
Reference: SU/QT/692N/14 11/11/2014, Location: Africa
Category: Switches

Scope of Work
Supply, Installation and Commissioning of Electrical Switchgear at Moi International Airport (PS12) Pump Station.


Related Prooducts: Switches Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Halliburton & Honeywell Collaborate to Improve Asset Productivity
Halliburton Labs Names First Advisory Board Members
Halliburton Releases New Hybrid Drill Bit
Halliburton Introduces First Intelligent Fracturing System
Oil and Gas Pipeline

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us