Design, Fabrication & Supply of Handling
Reference: GT14116100 11/20/2014, Location: Middle East
Category: Lifting & Handling Equipment
Scope of Work
Design, fabrication, supply, wet testing and demonstration of handling and lifting frames for offshore operations contractor shall design, manufacture, fabricate, supply, wet test and demonstration of pipeline/ coupling connector Handling Frames and Lifting Frames, intended to be used by QP for carrying out sub-sea Pipeline repairs as detailed in the Scope of Work, complete with all ancillaries and associated equipment for handling, lifting, shifting, aligning and mud mating of the pipeline/connector ends and installing/ sliding pipeline coupling connector over their related pipeline/spool and activating the connector while carrying out sub-sea Pipeline repairs: I- Handling Frame 15 Tons: 1 No. ii- Handling Frame 40 Tons : 1 No. iii- Lifting Frame 20 Tons : 2 Nos. iv- Lifting Frame 45 Tons : 2 Nos.
|