EPIC for Automated Choke Valves at Six Wells
Reference: GT15100421 1/22/2015, Location: Middle East
Category: Valves
Scope of Work
The project study scope involves: - Replace the existing manual choke valves at production wellheads DK476, 478, 479, 475, 489 and 503 at Gas Recycling plant in Dukhan with automated choke valves operable remotely from plant DCS.
- Provide necessary mechanical and piping modifications at the above mentioned wellheads for the installation of automated choke valves.
- Provide necessary instrument and control system modifications at plant DCS and wellhead hydraulic control panels.
- Modify the existing RTU and MTU for the above mentioned 6 production wells to provide the automated choke valves.
- Project study scope is illustrated in the enclosed control schematic and marked up P&ID
|