Installation of LSFO, FG and Gas Oil Pipelines
Reference: BID9065 9/6/2009, Location: Middle East
Category: Pipe Lines Installations
Ref. No.: RFP-2033
Issue Date: 06-Sep-2009
Pre-Tender Meeting Date: 12-Oct-2009.
Question Closing Date: 15-Dec-2009
Original Bid Closing Date: 07-Feb-2010
Extended Bid Closing Date: 21-Mar-2010, 20-Apr-2010
New Bid Closing Date: 27-Apr-2010
Bond Validity: (90) days from the Bid Closing Date
Bid Bond: KD 200000
Scope of Work:
This tender is devided into two parts:
- Part I: EF/1713
Installation of Low Sulphur Fuel Oil (LSFO), FG and Gas Oil Pipelines from Mena Al Ahmadi to Sabiya & Doha Power Stations.
- Part II: EF/1760
Installation of FG and Gas Oil Pipelines and Pumping Station from Mena Al Ahmadi to Azzour & Shuaiba Power Stations.
This tender limited for the following companies:
Aker Kvaerner, Bechtel Ltd UK, Chiyoda Corporation Japan, Daelim Industrial Co. Ltd. S. Korea, Foster Wheeler Energy Ltd UK, GS Engineering & Construction Corp, Hyundai Engineering & Construction Co. S. Korea, Hyundai Heavy Industries Korea, JGC Corporation Japan, KBR Overseas Operations Ltd KSA, Lurgi Oel-Gas-Chemie GMBH Germany, Petrofac International Ltd Sharjah UAE, Saipem S.A France, Saipem Spa Italy, SK Engineering & Construction Co. Ltd S. Korea, Technip France and Technip Spa Italy.
|