Recovery of Precious Metal
Reference: LT15102100 3/30/2015, Location: Middle East
Category: Metals Working
Scope of Work
The objective of this contract is to utilize the Services of contractor, at the Refinery, on Call-Off basis for three (3) calendar years starting from the effective date of the contract to undertake the following: 1. Recovery of the precious metals such as Platinum, Rhenium and Palladium from the spent catalysts. 2. Witnessing sampling and conducting assay analysis for precious metals content of fresh catalyst manufactured by M/s. UOP and M/s. Clariant.
|