FEED for Waste Heat Recovery Project
Reference: LTC/C/VEN/2168/15 7/13/2015, Location: Middle East
Category: Engineering
Scope of Work
Contractor is required to carry out the Front End Engineering Design (FEED) study for the conversion of the existing QG1 simple gas turbine generators into a combined and cogeneration plant complete with all deem necessary auxiliary equipment in order to maintain and/or improve the current system reliability, to optimize the facility's fuel utilization efficiency and to reduce the facility's CO2 and NOx emissions.
|