Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Installation of New Truck Loading
Reference: BID908933 1/24/2016, Location: Africa
Category: Tank Truck

Scope of Work
The Company intends to invite specialized engineering companies to perform basic and feed package to install a permanents truck loading system facilities of LPG products per local market demand.

To perform that the scope of work shall include the followings:-
- Feasibility study and cost estimate.
- Detailed engineering based on the feasibility study findings.
- Truck specification and loading location shall be according international technical specifications and safety standard.



Related Prooducts: Tank Truck General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Tenders: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Tank Truck  Tankers 

Sterling Energy Changes Directorate
Sterling Executive Director Appointments Engagement of Joint Broker
Sterling Energy Changes its Board
Sterling Energy Announces Name Change to Afentra
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us