Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Installation of Wellhead
Reference: RFP-237850 2/9/2016, Location: Middle East
Category: Christmas Tree/Wellhead Valves

Scope of Work
Provision of service personnel for installation of wellhead and x-mas tree, SSV and control panel.


Related Prooducts: Christmas Tree/Wellhead Valves Air Valves  Ball valves  Butterfly Valves  Check Valves  Christmas Tree/Wellhead Valves  Cone Valves  Control Valves  Diaphragm pilot control valves  Fire certified valves  Fire Hydrant  Gate Valves  General  Globe Valves  HP Butterfly Valves  IRIS Control valves  Knife Gate Valves  Metal Diaphragm Valves  Needle Valves  Pinch Tube Valves  Piston Pilot control valves  Piston Valves  Plastic Diaphragm Valves  Plastic Valves  Plug Valves  Pressure Relief Valves  Safety Valves  Sight Glass  Solenoid Valves  Steam Traps  Strainer  Valve Actuators  Valve Limit Switch  Valve Positioner 

Related Tenders: Ball valves  Butterfly Valves  Check Valves  Christmas Tree/Wellhead Valves  Control Valves  Gate Valves  General  Globe Valves  Plug Valves  Pressure Relief Valves  Safety Valves  Solenoid Valves  Steam Traps  Valve Actuators  Valve Positioner 

EQT Reports 4t Quarter & Year-End 2020 Results
Hamworthy Wins Pump Contract
Targa Reports Fourth Quarter and Full Year 2020 Financial Results
Solar Alliance Closes $5.7M Marketed Private Placement of Units
Exploration
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us