Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Provision of Integrated Offshore Construction Works
Reference: 0500232 2/18/2016, Location: Africa
Category: Engineering

Scope of Work
The company invites the compnanies to tender for Integrated Offshore construction Works for the project and FSO Unity.

The scope of work consists includes the following:

- Engineering (DE site survey, Preparation of construction drawings and QA/QC documents, HSE documents, Project Management documents etc.)

- Procurement (All consumables, Pipes, Steel structural materials, LLIs, Paints, PPEs)

- Workshop Pre-fabrication works.( Cutting, fitting, welding, NDT, hydro test, blasting & painting and storage)

- Electrical & Installation: Installation, Calibration,

- Pre-mobilization of equipment (scaffold materials, Welding Machines, Bending Machines, compressors, painting and blasting equipment)

- Mobilization of materials, equipment & personnel from Contract or yard to Onne & NAF Base.

- Offshore Site works (Scaffolding, Installation and painting activities)

- De-mobilization (Rehabilitate site, Prepare equipment / materials for load out, Move load from ONNE and Move Personnel from NAF base.

- Prepare As-Built documents and close out report.



Related Prooducts: Engineering Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Tenders: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Year-Round Fuel Deliveries by Gazprom Neft
Gazprom Neft Recorded Consistent Net-Profit Growth
Gazprom Neft Delivers a 3.5-Fold Sales Increase in Environmentally Fuels
Gazprom Neft Increases Energy Efficiency at Its Directly Owned Refineries
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us