Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply of Line1 Process Instruments
Reference: SU/QT/769N/15  2/28/2016, Location: Africa
Category: Instruments

Scope of Work
The company invites the tenders for the Supply, Installation & Commissioning of Line1 process instruments.

Each equipment shelf shall be clearly and indelibly labelled with the name of the site at which the equipment is installed.

Each label shall be engraved on a stainless steel plate. Each instrument shall be marked with its function, manufacturer’s name or trademark, code or type number, together with the batch and serial number and its modification status.

Each detachable unit shall be either marked so as to enable it to be identified with the parent equipment, or else marked with the manufacturer’s name and type number or code number and where definable its function.



Related Prooducts: Instruments Analyzers, Gas  Calibration Equipment  Calibrators, Electronic, Pneumatic  Concentration  Conductivity Meters  Density  Detector, Gas  Dissolved Oxygen meters  Drilling Instruments  Float Switch  Gas meters  General  Indicators and Recorders  Leak Locators  Level meters  Liquid Measurement  Load cells  Monitoring & Control  Mud Control  Mud Logging  pH and REDOX  Pressure gauges/ Transmitters  Radiation Detection  SCADA Systems  Temperature gauges/ Transmitters  Thermocouples  Thermowells  Transducers  Transmitters  Transmitters, Pressure  Turbidity Meters  Viscosity  Weather Station  Weighing Equipment 

Related Tenders: Analyzers, Gas  Calibration Equipment  Calibrators, Electronic, Pneumatic  Conductivity Meters  Density  Detector, Gas  Dissolved Oxygen meters  Drilling Instruments  Gas meters  General  Indicators and Recorders  Leak Locators  Level meters  Liquid Measurement  Monitoring & Control  Mud Logging  Pressure gauges/ Transmitters  SCADA Systems  Temperature gauges/ Transmitters  Thermocouples  Thermowells  Transmitters  Transmitters, Pressure  Viscosity  Weather Station 

Iran Became Completely Self-Sufficient in Pipeline Construction
First 3.2 MW Pump of Goreh-Jask Project Delivered
NIDC Drills 117 Oil, Gas Wells in One Year
Ab Teimour Up for Investment
Oil and Gas Pipeline

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us