Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply & Installation of PMCC Panels
Reference: SDI1363P17 6/7/2016, Location: Asia
Category: Control Panels

Scope of Work
The company invites bids for Design, Engineering & Manufacture, Supply, Installation, Testing and Commissioning of 2 nos. 415 V, 3 phase, TP, 50 Hz PMCC panels at Hebeda Oil Collecting Station of the company at Hebeda village under Lankashi Police Station, Dist. Tinsukia, Assam, for supplying electrical power to air compressors and various other motors and loads from generator house. Both the panels shall be similar in construction, except the quantities and capacity of incomers/outgoing feeders and starters and size.


Related Prooducts: Control Panels Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Canadian Overseas Petroleum Set to Complete Atomic Oil and Gas Aacquisition
Cancellation of Listing
Completion of Atomic Acquisition
COPL Announces Exercise of Warrants
Exploration
Development
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us