Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Construction of 36” Strategic Crude Supply Line
Reference: RFP-242033 8/22/2016, Location: Middle East
Category: Oil and Gas Pipeline

Scope of Work
The company announces its need for Construction 36” Strategic Crude Supply Line from KNPC Manifold UPTO MAB Refinery Fence & Modification to Existing Crude Feed Lines to MAB & Shuaiba Refineries.

The contractor shall survey, design, carry out basic and detailed engineering, supply all temporary and permanent materials, equipment, facilities and manpower, perform all engineering, procurement and construction services required to construct, pre-commission/test, commission and performance tests and any other work which could reasonably be deemed as necessary to provide the Company with complete proven and operable facilities, in accordance with the technical specifications, drawings, data sheets, specifications and information furnished in this package and to restore the entire pipeline corridor and all associated facilities such as KNPC Manifold, Electrical Substations back to normal operation.



Related Prooducts: Oil and Gas Pipeline General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Tenders: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Tank Truck  Tankers 

European Energy Signs 2 More Orders for Siemens Gamesa 5.X Onshore Platform
Siemens Gamesa & Repsol Signed Contract for Installation of Wind Turbines
Siemens’s Helps Advance CO2-Free Power Supply in California
Siemens Accelerates Digital Marketplace Strategy with Acquisition of Supplyframe
Exploration
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us