Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Replacement of Tank Bottom Plates
Reference: STC/C/MNT/2807/16 12/26/2016, Location: Middle East
Category: Steel Plates

Scope of Work
The company announces its need for Replacement of Tank Bottom plates for Potable Water Storage Tank 29-T9402 in QG-2 asset after cutting and removal of existing bottom plates. All Work shall be performed at site.



Related Prooducts: Steel Plates Barrels & Containers  Dish Ends  General  Glass Lined Tanks  Metal Pressure Vessels  Metal Tanks  Plastic Pressure Vessels  Plastic Tanks  Steel Plates  Vessels Internals 

Related Tenders: Barrels & Containers  General  Metal Pressure Vessels  Metal Tanks  Steel Plates  Vessels Internals 

President Energy Announces Drilling Update
President Energy Announces Drilling Success at EV-1001
President Energy Announces Operations Update
President Energy Announces Operations and Prices Update
Natural Gas
LNG Processing
LPG Domestic use

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us