Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Trunk Line Phase II Steel Pipes
Reference: CMIT-PRT-10.30-170027 2/23/2017, Location: Middle East
Category: Steel Pipes

Scope of Work
The company announces its need for supply of Trunk Line Phase II Steel Pipes.

Associated gas and oil mixture from the degassing station is transported separately via trunk lines to junctions and subsequently sent to the BUT field. The Trunk Line Phase II will be executed in the future. Therefore, there is a demand of steel pipes and related hot bends. The diameter of the line pipes is from 16 inch to 18 inch and the total quantity of pipes is 85 km.



Related Prooducts: Steel Pipes Anchors  CPVC Pipes  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Pipeline Heating Equipment  Piping Accessories  Plastic Pipes  PP Pipes  PTFE Rods  PVC Pipes  PVDF Pipes  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Related Tenders: Anchors  General  GRP Pipes  Hydraulic Hoses  Iron Pipes  Metallic Hoses  PE Pipes  Pigs  Pipe Cleaning Equipment  Pipe Drilling and Tapping  Pipe Inspection & Testing Equipment  Pipe Lining, coating & insulation  Pipe Locating Equipment  Pipe Repair  Pipe, Casing & Tubing  Piping Accessories  PTFE Rods  Rubber Hoses  Stainless Steel  Stainless Steel rods  Steel Pipes 

Reliance Acquires Majority Equity Stake in Skytran
RNESL to Acquire 40% Stake in Sterling & Wilson Solar
RNESL Acquires REC Group
Reliance Industries Buys Norwegian Solar Cells Maker at Value of $771M
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us