Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply and Installation of Electronic Grounding System
Reference: CF/11252-SR  3/13/2017, Location: Asia
Category: Earthing materials

Scope of Work
The company announces its need for supply and Installation of Electronic Grounding System at Machike & Shikarpur.


Related Prooducts: Earthing materials Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Another High-Yield Well Was Drilled in the Dongsheng Gas Field
Jiangsu Petroleum's First Photovoltaic Power Station Completed
Sinopec Capital Corporation Invests in Longze Technology
Sinopec's First Hydrogen Refueling Station of Jiangsu Petroleum Put into Use
Production
Oil Treating & Refining
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us