EPIC for Production Facilities Upgrade & Tie-Ins
Reference: GT17106400 8/14/2017, Location: Middle East
Category: Engineering Procurement and Construction (EPC)

Scope of Work
The company invites all prospective suppliers and contractors for EPIC for Production Facilities Upgrade & Tie-Ins.

As part Dukhan Production Facilities Upgrade (DPFU) Project, The company propose to undertake the subject accelerated scope during the Upcoming Jaleha TA shutdown planned in Q1-2019.

Contractor shall carry out the detailed design and engineering, procurement, installation, construction, pre-commissioning, commissioning, performance testing, and start-up of the FACILITY as described hereafter.
1- Internal Upgrade of Two (2) nos. Production Separators at JDS: This will serve as a "pilot" to reassess/confirm the anticipated improved separation efficiency highlighted during DPFU study.
2- Replace Two (2) nos. of existing hydrocyclones at JDS with two (2) nos. new hydrocyclones with more efficient liners. The existing hydrcocylones are required to be replaced at the same location as the existing ones.
3- Sample collection and analysis: This will help to establish performance guarantee of the upgraded Production Separator and establish Produced Water stream data from upgraded Production Separator to further optimize the secondary PWT Packages (DPFU Phase-1A).
4- Modify / install new internals of Wet Lift Gas KO Drum & Diyab Slug Catcher at JDS
5- Provision of Early Tie-ins at JDS: This will facilitate implementation of proposed facilities under DPFU Phase-1A project without the need for additional shutdown.



Related Prooducts: Engineering Procurement and Construction (EPC) Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

NAOC Shuts Idu Well 11 after Leak
Fast4Ward MPF2 Delivered to SBM Offshore
LGM Engineering Awarded Orders for Eight LNG Fuel Gas Systems
Billions of Pounds of Green Investment Jeopardised by GB Regulations
LNG Processing
Oil & Gas Companies
Natural Gas
GTL Processing
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us