Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Purchase Of Water Injection Boosting Pumps For Stage 2
Reference: HFY-PUR/F&C0895-0882  9/7/2017, Location: Middle East
Category: Pumps: Centrifugal

Scope of Work
The company announces its need for Purchasing of Water Injection Boosting Pumps for Stage 2.


Related Prooducts: Pumps: Centrifugal Axial Flow Pump  Deep Well Pumps  Fire Certified Pump, Portable & Wheeled  Fire Certified Pump, Skid mounted  General  High Pressure Pumps  Horizontal Centrifugal End Suction Pumps  Horizontal Split Case Pumps  Hydraulic Pumps  In-Line Pumps  Magnetic Coupled  Mixed Flow Pump  Mud Pumps  Multistage Horizontal Centrifugal  Plastic Pumps  Self Priming Pumps  Slurry Pumps  Submersible Pumps  Vacuum Pumps  Vertical Centrifugal Pump  Vertical Pumps w/ Cardan Shaft  Vertical Split Case Pumps  Vertical Submerged Pumps 

Related Tenders: Fire Certified Pump, Portable & Wheeled  Fire Certified Pump, Skid mounted  General  High Pressure Pumps  Horizontal Centrifugal End Suction Pumps  Horizontal Split Case Pumps  Hydraulic Pumps  Mud Pumps  Self Priming Pumps  Submersible Pumps  Vacuum Pumps  Vertical Centrifugal Pump  Vertical Submerged Pumps 

Cheniere Reports Strong First Quarter 2021 Results
EnCap Investments Closes $1.2B Energy Tranisition Fund
3D at Depth Strengthens Its Position in the Offshore Integrity and Inspection Industry
APA Corporation Announces First-Quarter 2021 Financial & Operational Results
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us