Provision Nitrogen Gas System Upgrading Project
Reference: 858 10/25/2017, Location: Africa
Category: Gas Processing

Scope of Work
The company announces its need for Provision Nitrogen Gas System Upgrading Project/EPIC Phase@NGL Recovery Plant / A-100.

Scope of Work
Upgrading the existing nitrogen gas system (unit 320) in order to increase amounts of nitrogen gas production rate needed forexisting NGL recovery plant facilities (750 Nm3/hr,Purity:1% oxygen) during normal operating conditions and ( 1800 Nm3/hr, Purity:3 % oxygen) plant planned shutdowns ,hence maximum current daily production rate of existing system about (300 Nm3/hr).
The scope of work should include implementation of EPIC project phase on Turn-Key basis (Basic dasign review, Detailed .Eng, Procurement, Material supply , Contruction & Installation ,Comm.and Start-up ) based on the following :-

1. Overhauling / Improvement the existing nitrogen gas system,include :-
- Replacing parts of existing equiments {Adsoptio media (molecular sieve ,butterfly valves , PCV & on – off valve , drain system of compressores lines).
- Installation of new equipments{ water – cooled refrigention dryer ,local PLC, safety valves ).
- Dismanting & Removal parts of existing equiments (cooling water refrigention dryer).
2. Installing of new nitrogen gas system (new train ) in parallel with existing one.
(Capacity of 750 Nm3/hr and 1800 Nm3/hr,respectively at 99%and 97% Purity and it will be located west of the existing building ,on the other sider of the road .similarly to the existing one , the new unit and shall be designed to produce 400 Nm3/hr Instrument Air& 200 Nm3/hr services Air.
3. Carry out all related works (Process .,Civil,mech., Piping , HSEQ, ets).



Related Prooducts: Gas Processing Deodorization system  Gas dehydration  Gas sweetening  Gas Treating  General  GTL Processing  LNG Processing  LPG Domestic use  LPG Odorless  Packing  Phase Separation  Scrubbers 

Related Tenders: Gas dehydration  Gas sweetening  Gas Treating  General  LNG Processing  LPG Domestic use  Packing  Phase Separation  Scrubbers 

Stage 1 Work Progression
Northern Oil and Gas Announces First Quarter 2021 Results
Obsidian Energy Announces First Quarter 2021 Results
Saga Pure Announces First Quarter 2021 Financial Results
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us