Amaml Tank Farm Piping Replacement
Reference: 1/2018 1/22/2018, Location: Africa
Category: Maintenance and Repair

Scope of Work
The company announces its need for Amaml Tank Farm Piping Replacement.

Summary of the Work:
• Replace the Amal Tank Farm VEBA (HOO) and AGOCO inlet and discharge piping (20”,30”,36”) on a ‘like for like’ basis using modified Mott Macdonald drawings and scope of work The new scope includes the following additions:
- Piping tie-in connections for future installation of booster
pump suction and discharge piping when sufficient funds
are available to execute this work.
- Replace the 30" and 36" suction headers piping between
the metering area isolation valves and main oil line pump.
- Replace the 36" crossover piping between Tanks 3 & 4.
- Provide methodology and procedures for fluid
recirculation between tank booster pumps and upstream
of the metering area to ensure flow during periods that
the tank farm is off line.



Related Prooducts: Maintenance and Repair Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Related Tenders: Consultancy  Engineering  FEED  General  Maintenance and Repair  Process Technology Licensing  Production Engineering  Project & Resource Management 

Gazprom’s Financial Information under IFRS for 3 Months Ended March 31, 2021
Alexey Miller & Battsetseg Batmunkh Discuss Soyuz Vostok Project
Alexey Miller & Gerhard Schroeder Hold Working Meeting
Alexey Miller & Francois Fillon Discuss Development of Europe’s Energy Market
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us