PM of Tank No (5), Comprising a 500,000 US bbl Floating Roof Tank
Reference: 2/2018 1/29/2018, Location: Africa
Category: Maintenance and Repair
Scope of Work
The company announces its need for supply of PM of tank No (5), comprising a 500,000 US bbl floating roof tank.
Contractor is required to perform all assigned work, inspection, repair and maintenance and return the tank to service in a safe, according to the API 575 and API 653.
|