Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

EPC to Construct Car Parking Sheds
Reference: QEN-18-930 2/15/2018, Location: Middle East
Category: Engineering Procurement and Construction (EPC)

Scope of Work
The company announces its need for EPC to Construct Car Parking Sheds with Solar Photovoltaic Panels.

The contractor shall carry out the following scope of work, but not limited to:
- Carry out Engineering, Procurement and Construction (EPC) of the project comprising of the following three locations:
Location-1: Car parking at Oman LNG site plant- Qalhat; consist of around 550 car parking slots.
Location-2: Car parking at the New School in Al Ghalyla- Sur; consist of around 70 car parking slots.
Location-3: Car parking at Hay Al Sharooq (HAS) in Al Ghalyla- Sur; consist of around 200 car parking slots.

- Carry out site survey and detailed engineering and all required engineering studies ,surveys for the Civil scope and Electrical scope (Solar Photovoltaic panels, inverters, tie-in to existing system, transformers, RMU, LV panels and circuit breakers, etc.).

- Construction of the car park shed and install Photovoltaic Solar Panel at roof top of the shed
and feed the solar generated power to the electrical network.

- Rerouting and termination of existing underground and above ground services.

- Cable trench excavation, routing of the Power Cables, instrument cables and all wiring connections.

- Carry out Engineering, Drawings & documents preparation, Materials & Services Procurement, Supply, Manufacturing, Fabrication, Shipping, Transportation, Delivery, Assembly, Construction, Installation, Inspection, Testing, Painting, Certification, Supervision,
Management, Commissioning including supply of Testing equipment’s, Special tools & Spare parts, Coordination and Training of company personnel for Operation & Maintenance.

- Contractor shall obtain all required permits from government authorities to complete the entire
work and hand-over.

- Contractor shall be responsible for all tie-in works to Oman LNG grid for location-1 and to Local Distribution grid for location-2 & location-3.




Related Prooducts: Engineering Procurement and Construction (EPC) Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Related Tenders: Civil Works  Civil Works - Finishing works  Construction Contractors  Electrical Works  Engineering Procurement and Construction (EPC)  Engineering Procurement and Construction Management (EPCM)  General  Mechanical Works  Pipe Lines Installations  Steel Works 

Pertamina Successfully Completed, Put out Fires in Cilacap Refinery Tank Area
Pertamina Continues the Tuban Grass Root Refinery Project
Pertamina Balikpapan Refinery Development Project Pursues Target
Pertamina Signed HoA to Supply LNG
LNG Processing

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us