Replacement of Three Desalters and Three Oil Heaters
Reference: MTC-28/2018 6/19/2018, Location: Africa
Category: Process Equipment

Scope of Work
The company announces its need for Replacement of Three Desalters and Three Oil Heaters at Nafoora CPS (Unit)Project No. L-36.

The objectives of this project is to procure / replace / install three (03) numbers of electrostatic Desalters with three Oil Heaters for the Nafoora CPS (unit), The treated oil shall meet the specifications as outlined in the document (Sub-section VIA, Clause 7.2) and shall be in compliance with NOC Specification and other International Standards. The Contractor shall perform all the works from the Engineering, Procurement/Supply, Construction, Pre-commissioning and Commissioning of the Project (EPCC).







Related Prooducts: Process Equipment Adsorption Equipment & Materials  Aerators  Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Clarifiers  Condensers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Mixers, Static  Nozzles/Diffusers  Steam Generators  Ventilators 

Related Tenders: Agitators & Mixers  Air Conditioning & Refrigeration  Bailers, Sand  Blowers  Boilers  Cooling Towers  Dryers, Drying Machinery & Equipment  Emulsifiers  Furnaces  General  Heat exchangers  Steam Generators 

Canacol Tests 35.5 MMSCFPD at Aguas Vivas 1
Aguas Vivas 2 Appraisal Well Encounters 229 Feet of Net Gas Pay
Canacol Reports a 13% Increase in Realized Contractual Natural Gas Sales Volumes
Canacol Announces Execution of Strategic Long Term Take Contract with EPM
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us