Provision of EPCC of Water Injection Booster Stations
Reference: HFY-CON/F&C0975-0998 8/6/2018, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
The company announces its need for Provision of Engineering, Procurement, Construction and Commissioning of Water Injection Booster Stations (WIBS) 1, 2 & 3.
For three (3) water injection booster station, the project shall cover but not limited to: a) Installation of twelve (12) booster pumps; b) Power substation and distribution system, including transformers, switchgears, UPS etc.; c) Tie-in with existing facilities; d) Instrumentation and Station Control system; e) CPF1/2/3/ and OCC integration; f) Telecommunication system; g) Water supply and drainage system; h) HVAC and firefighting facilities; i) Civil/Structure works.
|