Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Provision of Running the Cased Wireline Services at Erawin Field (Nc200)
Reference: BID915562 10/2/2018, Location: Africa
Category: Cementing, Stimulation

Scope of Work
The company announces its need for Provision of Running the Cased Wireline Services at Erawin Field (Nc200).

The required cased hole services are as following:
- Cementing /Casing evaluation measurements.
- Cased Hole Reservoir Saturation measurement (Sigma & C/O mode).
- Production Logging.
- Log analysis interpretations with a report need to be provided for the above-mentioned services.



Related Prooducts: Cementing, Stimulation Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Tenders: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Seadrill New Finance Limited Announces Extension of Forbearance Agreement
Seadrill Limited Announces Settlement Agreement with Northern Ocean Ltd.
Seadrill Limited Announces First Half 2021 Results
Court Approves Disclosure Statement Paving the Way for Chapter 11 Emergence
Oil & Gas Companies
Production
Natural Gas Storage
Oil Treating & Refining
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us