Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Hiring of Cementing & BHP Services
Reference: CJG-9867-P19  12/4/2018, Location: Asia
Category: Cementing, Stimulation

Scope of Work
The company announces its need for Hiring Of Cementing & BHP Services for Thermal and Non-Thermal Completion Vertical/Deviated Wells in Pml & Oalp Blocks in Rajasthan Project for a Period of Two(02) Years with a Provision of Extension by Another One (01) Year or Part There off.

a) Cementing Unit (twin-pumping) must be capable of achieving a maximum pumping pressure of 10,000 psi and maximum discharge rate of 10 bbl (US) per minute.

b) Bulk Handling Plant must be equipped with three (03) nos. Pneumatic Silos of capacity 1000 cubic feet each so that total capacity is not less than 3000 cubic feet & two (02) nos. Air Compressors (minimum air pressure required for operation - 40 psi).

c) Transport Silo (one no) with air manifold system & having a carrying capacity of 18-25 MT of cement.
d) Batch Mixer must have handling capacity of 100 - 120 bbl (US).

e) Vintage: Cementing Unit, Batch Mixer, Bulk handling plant, Transport silo and other surface tools/equipment must not be of more than 10 (ten) years old as on original Bid Closing Date (BCD) counted from the date of manufacture. Bidders must submit a certificate along with their Technical Bids confirming the vintage and certifying that all the equipment will be deployed in perfect working condition.




Related Prooducts: Cementing, Stimulation Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Tenders: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

The First Phase of the Zhenhai Base Project Is Fully Completed
First Phase of the Sinopec Guizhou 500,000 Tons/Year PGA Project Started
Sinopec Proven Large Gas Fields with Reserves of 100 bcm in Sichuan Basin
The Beihai Refining & Chemical Restructuring Was Fully Put into Operation
Exploration
Development
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us