Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Construction of Approach Road
Reference: CDC0306P19 1/25/2019, Location: Asia
Category: Construction

Scope of Work
The company announces its need for Construction of Approach road, Plinth, Road over plinth, Effluent Pit, CC/RCC Foundations for LOC BJB and Construction of Plinth & Foundations for cluster Location BJC to suit CH-6 QUIPPO (E-2000) Outfit or any other Outfit in Baghjan Area or any other Location in Baghjan, Mechaki & Duarmara area.

The instruments to be supplied are as follows: -

- Item 001 Qty=0.13 of Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means:-In area of light jungle

- Item 002 Qty=1290.00 of Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.All kinds of soil.

- Item 003 Qty=1300.00 of Cutting and uprooting manually all kinds of tea bushes, small bamboo stumps or any other small under growth etc.

- Item 004 Qty=20.00 of Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable .Beyond 60 cm girth upto and including 120 cm girth.

- Item 004 Qty=20.00 of Uprooting tree stumps and removing them to 30m from site of operation for girth of tree from 300mm upto one metre but for girth of tree over one metre and upto 2 metre.










Related Prooducts: Construction Building Systems  General  Steel structures 

Related Tenders: Building Systems  General  Steel structures 

Tamarack Announces 2nd Quarter Financial Results
Blueknight Declares Quarterly Distributions
Enphase Reports Financial Results for the Second Quarter of 2021
Atos Expands its Manufacturing Capabilities with Acquisition of IDEAL GRP
Exploration
Development
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us