Provision of EPCC for Power Supply to Well Pads
Reference: HFY-CON/F&C1048-1071 8/1/2019, Location: Middle East
Category: Engineering Procurement and Construction (EPC)
Scope of Work
The company announces its need for Provision of Engineering, Procurement, Construction and Commissioning for Power Supply to Well Pads (2020-2021).
The brief scope of work for this tender shall be inclusive of but not limited to the following: - Detailed design, Geological investigation & Topographical Survey, materials procurement, Construction and Installation, Commissioning, as-built document and one-year warranty. - 35 km 33kV OHTL (Steel Poles) with OPGW including Civil Foundation /Structure works for OHTL. - Build 42 sets of Pre-fabricated Outdoor Substations (POS) with transformers at well pads including related well pad power distribution. - ESP skid foundation at well pads for 71 ESP wells. - Remove the existing Diesel Generators/Transformers and related oil tank, piping, cables and foundation.
|