Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Installation of New Diesel Fuel Supply System
Reference: MTC-40/2019 9/11/2019, Location: Africa
Category: Diesel Engine

Scope of Work
The company announces its need for Installation of new diesel fuel supply system for the two (2) new turbine sets at GC-1 Sarir- Project No: L-63.

The scope of works includes engineering, design, procurement and build one (1) completely operational fueling facility tank at GC-1 sarir field that will provide diesel fuel for (2) new turbine units.

The project will also include installation of the piping along with two (2) mew transfer pumps that will load above mentioned new tank from the existing diesel fuel tank T-12 at GC-1 area (distance is around 600m0





Related Prooducts: Diesel Engine Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Hydro  Turbines: Steam 

Related Tenders: Diesel Engine  Engine Parts  General  Generating Sets  Generators  Marine Diesel Engine  Power Pack  Turbines (General)  Turbines: Gas  Turbines: Steam 

NOC to Survey Caribbean Marine Environments as part of CME Program
Maxon Takes Brushed DC Motors to Higher Temperatures
Webtool Announces New HCV220 Heavy-Duty Cable Cutter
IMCA Accredited Diving System Inspector Scheme in Development
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us