Provision of ESP Services
Reference: 066/SC/19 5/23/2020, Location: Middle East
Category: Submersible Pumps

Scope of Work
The company announces its need for supply of ESP Services for five firm years plus one optional year.

The total scope of this work is to provide downhole and surface equipment and associated services that include but not limited ESP sizing and selection, ESP installation, commissioning/start-up, daily operation management, pulling out, teardown, testing, assembly, failure analyse, reporting, training, inventory management, workshop, maintenance and equipment optimization.

The downhole and surface equipment includes but not limited: ESP Pump/intake; Gas separator/advanced gas handle system; ESP Motor; Protector/Seal Section; Main ESP Cable; Motor Lead Extension (MLE); Downhole Monitoring Systems; Cable bands, MLE Cable Clamps and Cross Coupling Cable Protectors; Motor Guide; Wellhead Cable Feedthrough System; Check valve and bleed valve or equivalent devices; Surface VSD system; Surface Cable

The range of pump rates will vary by reservoir and well. The expected pump rates have been categorized into 4 rate ranges for the purposes of standardizing equipment (rate is based on recommended operation range of catalogue pump curve): High rate (2500-4000 bfpd); Medium rate (1300-2500 bfpd); Low rate(600-1300 bfpd); Low low rate(200-600 bfbp).

It is estimated this service request scope ESP wells number will be as below:

- 1st Contract Year: Net increased (20 New ESP wells + 70 existing ESP wells replacement). Total ESPs at the end of 1st Contract Year would be 90;

- 2nd Contract Year: Net increased (9 New ESP wells +65 existing ESP wells replacement). Total ESPs at the end of 2nd Contract Year would be 164;

- 3rd Contract Year: Net increased (0 New ESP wells +50 existing ESP wells replacement). Total ESPs at the end of 3rd Contract Year would be 214;

- 4th Contract Year: Net increased (0 New ESP wells +16 existing ESP wells replacement). Total ESPs at the end of 4nd Contract Year would be 230;

- 5th Contract Year: Net increased (0) Total ESPs would be 230.



Related Prooducts: Submersible Pumps Axial Flow Pump  Deep Well Pumps  Fire Certified Pump, Portable & Wheeled  Fire Certified Pump, Skid mounted  General  High Pressure Pumps  Horizontal Centrifugal End Suction Pumps  Horizontal Split Case Pumps  Hydraulic Pumps  In-Line Pumps  Magnetic Coupled  Mixed Flow Pump  Mud Pumps  Multistage Horizontal Centrifugal  Plastic Pumps  Self Priming Pumps  Slurry Pumps  Submersible Pumps  Vacuum Pumps  Vertical Centrifugal Pump  Vertical Pumps w/ Cardan Shaft  Vertical Split Case Pumps  Vertical Submerged Pumps 

Related Tenders: Fire Certified Pump, Portable & Wheeled  Fire Certified Pump, Skid mounted  General  High Pressure Pumps  Horizontal Centrifugal End Suction Pumps  Horizontal Split Case Pumps  Hydraulic Pumps  Mud Pumps  Self Priming Pumps  Submersible Pumps  Vacuum Pumps  Vertical Centrifugal Pump  Vertical Submerged Pumps 

ExxonMobil Earns $4.7 Billion in Second Quarter 2021
ExxonMobil to Produce Renewable Diesel to Reduce Transportation Emissions
ExxonMobil Announces Discovery at Pinktail, Offshore Guyana
ExxonMobil to Certify Natural Gas, Help Customers Meet Environmental Goals
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us