Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

El-Feel 30” P/L Transmission System Upgrade & Enhancement
Reference: 956 2/6/2020, Location: Africa
Category: Oil and Gas Pipeline

Scope of Work
The company announces its need to revamp and upgrade the existing Fibre Optic(FOC) backbone in interconnecting between NC -174 and NC-115 for the distance of 72 KM, and the other FOC between NC -115 covers a distance about 725 km along the 30” pipeline to Mellitah Complex.

The existing network is constructed of 29 nodes using SDH technology STM – 4 (1662 SMC) nods in 20 sites ,while the remaining 9 sites are linked through the Alcatel 1521FL-IP optical line terminals Provided with optical and Ethernet interfaces. In all sites SCADA and phone traffic is connected and transferred towards the main control site NC -174.



Related Prooducts: Oil and Gas Pipeline General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Railways  Tank Truck  Tankers 

Related Tenders: General  LNG Carriers  LNG Terminal  Natural Gas Storage  Oil and Gas Pipeline  Oil Storage  Tank Truck  Tankers 

LEKOIL Announces FY 2020 Audited Final Results
Lekoil Provides Corporate and Operational Update
Lekoil Announces Annual Results for Year Ended 31 December 2020
Lekoil Announces Results for 6M Ended 30 June 2021
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us