Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Complete the Installation and Operation of Waste Incinerator
Reference: 950 3/3/2020, Location: Africa
Category: Waste Water Treatment Plant

Scope of Work
The company announces its need for Complete the Installation and Operation of Waste Incinerator in the Field of A-100.

The company intends to search for suitable contractors with extensive experience in the field of supplying and installing waste incinerators capable of completing a previous project that was not been completed in the field of Abu-atifel (A-100) by instating a waste incinerator on the concrete surfaces on sits with provision of spare parts and expired materials and materials where there is damage due to environmental factors.

The model is BMWR-300 and has a burning capacity of 300 kg per hour.

The scope of work includes, for example, the following list of activities:
1- Cleaning the area of sand that was deposited due to weather conditions.
2 – Supply and installation of all the necessary equipment for the gas pipeline and connect the line with a diameter of one and a half inches with a burner.
3 – Completing the supply of water such as pipes and reservoirs.
4 – Connect the power cable to the switchboard provided by ABB.
5 – The contractor shall provide all the materials lost from the original factory or similar.



Related Prooducts: Waste Water Treatment Plant General 

Related Tenders: General 

Western Midstream Announces Early Tender Results of Cash Tender Offers
Eguana Announces 3rd Quarter 2021 Financial Results
Sparton Resources Inc. Corporate Update
NIBE Acquires English Go Geothermal
Exploration

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us