|
|
|
Complete the Installation and Operation of Waste Incinerator
Reference: 950 3/3/2020, Location: Africa
Category: Waste Water Treatment Plant
Scope of Work
The company announces its need for Complete the Installation and Operation of Waste Incinerator in the Field of A-100.
The company intends to search for suitable contractors with extensive experience in the field of supplying and installing waste incinerators capable of completing a previous project that was not been completed in the field of Abu-atifel (A-100) by instating a waste incinerator on the concrete surfaces on sits with provision of spare parts and expired materials and materials where there is damage due to environmental factors.
The model is BMWR-300 and has a burning capacity of 300 kg per hour.
The scope of work includes, for example, the following list of activities: 1- Cleaning the area of sand that was deposited due to weather conditions. 2 – Supply and installation of all the necessary equipment for the gas pipeline and connect the line with a diameter of one and a half inches with a burner. 3 – Completing the supply of water such as pipes and reservoirs. 4 – Connect the power cable to the switchboard provided by ABB. 5 – The contractor shall provide all the materials lost from the original factory or similar.
|
Related Prooducts: Waste Water Treatment Plant
General
Related Tenders:
General
|
|
|
|