Provision of National Grid Power Utilization Upgrade
Reference: 013/SC/20 4/19/2020, Location: Middle East
Category: Cables

Scope of Work
The company announces its need for Provision of National Grid Power Utilization Upgrade.

Contractor’s Scope of Work includes but not limited to the major maintenance for the following items, for details, refer to attached scope of work.
- Install switch gear
- Install and move the cable
- The modification shall be completed within 180 days after the contract signed (or letter of award) and the commencement of works issued whichever is the latest.



Related Prooducts: Cables Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Energy Commodities on Rise for September
Warwick Investment Group Acquires Rosewood Eagle Ford Assets
SSE Renewables to Create World-Leading Offshore Wind Farm Opportunity
Indonesia Energy Discovers Oil in Its Second Back-to-Back Well at Kruh Block
Oil & Gas Companies

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us