Gulf Oil and Gas
      Go to 3D Projects Premium Content Zone >>  |  Logon Oil and Gas

Supply, Installation Testing & Commissioning of Flamer Proof LED Fixtures
Reference: 8000016461 2/18/2020, Location: Asia
Category: Lighting

Scope of Work
The company announces its need for Supply, Installation Testing & Commissioning of Flamer proof LED Fixtures in Place of Existing Flame proff HPMV/HPSV Lighting Fixtures of PC-1 Plant.


Related Prooducts: Lighting Accumulators and Storage batteries  Ammeters, Voltmeters, ect.  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Steel Panels  Switches  Transformers  Umbilical Lines  UPS 

Related Tenders: Accumulators and Storage batteries  Batteries  Cable Trays  Cables  Cathodic Protection  Circuit Breakers  Contactors  Control Panels  Earthing materials  Electric fittings & junction box  Frequency Inverter  General  Lighting  Panel Components  Starter  Switches  Transformers  Umbilical Lines  UPS 

Shelf Drilling Reports Second Quarter 2021 Results
Shelf Drilling Awarded New Contract in India with ONGC
Shelf Drilling Announces Contract Extension on the Key Manhattan
Shelf Drilling Announces New Contracts in the Gulf of Thailand

Gulf Oil and Gas E-Marketplace - Premium Content

Copyright © Universal Solutions S.A.E. All rights reserved. Privacy Policy. - Contact Us